CFP Study Guide 2026
Everything you need to pass the CFP exam in one place: the exam format, every topic to study, real practice questions with explanations, flashcards, and full-length practice tests. Free, no sign-up needed.
📋 CFP Exam Format at a Glance
📚 CFP Topics to Study (69)
✍️ Sample CFP Questions & Answers
1. A fence specification calls for posts embedded to a depth equal to one-third of the total post length. For a 9-foot post, what is the required embedment depth?
One-third of a 9-foot post equals 3 feet of required embedment depth, leaving 6 feet of post above grade.
2. On a fence estimate, 'indirect costs' would include which of the following?
Indirect costs (overhead) include items not directly tied to a single activity, such as permits, insurance premiums, and supervisory time allocated across the project.
3. A fence company's overhead rate is 22% of direct costs. If direct costs on a project total $15,000, what is the total estimated cost including overhead?
$15,000 × 1.22 = $18,300; the overhead rate is applied to direct costs to arrive at total project cost before adding profit.
4. A site plan includes a north arrow pointing toward the upper-left corner of the sheet. How should you orient your fence layout in the field?
The north arrow establishes the orientation of the drawing relative to true north, so field layout must match that rotational relationship.
5. What is the main benefit of using concrete for setting fence posts?
Concrete provides a solid, unyielding base for fence posts, preventing movement caused by wind, impact, or soil erosion. This stability is crucial for the fence's structural integrity and longevity, ensuring it remains upright and functional over time.
6. An inspector finds that a newly installed fence post is not plumb. According to industry standards, what is the generally accepted maximum out-of-plumb tolerance for fence posts?
Industry standards and most quality specifications allow fence posts to be out of plumb no more than 1/4 inch per foot of post height.