Accident Prevention and Emergency Response Flashcards
7 cards from real STSC practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Accident Prevention and Emergency Response flashcards as text
A construction worker is found unresponsive at the base of a scaffold. What is the FIRST action the supervisor should take?
Answer: Call 911 and ensure the scene is safe before approaching
Scene safety must be confirmed before approaching an injured worker to prevent the rescuer from also becoming a victim.
Which of the following best describes a 'near miss' in construction safety?
Answer: An unplanned event that did not result in injury but had the potential to do so
A near miss is an unplanned event with injury potential that did not result in actual harm, and reporting it helps prevent future accidents.
During an emergency evacuation drill on a construction site, workers should report to the designated assembly area primarily to:
Answer: Allow supervisors to account for all personnel
The assembly area allows supervisors to conduct a headcount and confirm all workers are accounted for and safe.
What type of fire extinguisher is appropriate for electrical equipment fires on a construction site?
Answer: Class C
Class C extinguishers are designed for energized electrical equipment fires because they use non-conductive agents.
A toolbox talk focused on accident prevention is MOST effective when held:
Answer: At the start of each shift before work begins
Pre-shift toolbox talks ensure workers are reminded of hazards and prevention measures before they begin work each day.
Under OSHA's incident reporting requirements, a work-related fatality must be reported to OSHA within:
Answer: 8 hours
OSHA requires employers to report all work-related fatalities within 8 hours of learning of the incident.
Which control method is considered MOST effective in the hierarchy of controls for preventing construction accidents?
Answer: Engineering controls (elimination/substitution)
Engineering controls — especially elimination or substitution of the hazard — are highest on the hierarchy because they remove or reduce the hazard at its source.