A mobile elevated work platform (MEWP) operator's certification has expired. What action should the site manager take?
Answer: Ground the MEWP and prohibit operation until valid certification is confirmed
Operating a MEWP without valid certification is a legal breach; the equipment must be stood down immediately.
Which hierarchy of control is most preferred when managing a site hazard?
Answer: Elimination of the hazard
Elimination removes the hazard entirely and is the highest and most effective level of the hierarchy of control.
During an excavation, a worker notices the trench sides showing signs of cracking. What should happen immediately?
Answer: Stop work, evacuate the excavation, and reassess the support system
Cracking trench sides indicate imminent collapse risk and require immediate evacuation and re-engineering of supports.
What is the minimum height at which edge protection is legally required on a construction site in most jurisdictions following CDM guidance?
Answer: 2.0 m
The Work at Height Regulations 2005 require edge protection where a fall could cause injury, with 2 m widely used as the trigger height for formalised protection.
A COSHH assessment identifies a substance as a skin sensitiser. Which control should be implemented in addition to ventilation?
Answer: Provide appropriate chemical-resistant gloves and skin monitoring
Skin sensitisers require dermal protection such as chemical-resistant gloves plus health surveillance to detect early sensitisation.
Which of the following is the site manager's responsibility regarding welfare facilities under the Construction (Design and Management) Regulations 2015?
Answer: Ensure adequate welfare facilities are provided and maintained throughout the construction phase
CDM 2015 Schedule 2 requires the principal contractor to ensure adequate, maintained welfare facilities are available from the start of construction.
A site manager receives a prohibition notice from an HSE inspector. What must the manager do?
Answer: Stop the specified activity immediately and do not resume until the notice is complied with
A prohibition notice requires immediate cessation of the dangerous activity; work cannot resume until the specified conditions are met.