Painting and Decorating Flashcards
6 cards from real Other Skilled Trades practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 6 Painting and Decorating flashcards as text
What does HVLP stand for in spray painting equipment?
Answer: High Volume Low Pressure
HVLP stands for High Volume Low Pressure, a spray system that atomizes paint with high air volume at low pressure to reduce overspray and waste.
In what direction should brush strokes be feathered for a smooth finish?
Answer: With the grain or in one consistent direction
Brush strokes should be feathered with the grain or in one consistent direction to produce a smooth, professional, streak-free finish.
How long does oil-based paint typically need to dry before a second coat is applied?
Answer: 24 hours
Oil-based paint typically requires 24 hours of drying time before a second coat to ensure proper adhesion between coats.
What minimum safety equipment is required when spray painting indoors?
Answer: Respirator and eye protection
When spray painting indoors, a respirator and eye protection are required to protect against inhaling atomized paint particles and solvent vapors.
What does cutting in mean in painting?
Answer: Painting edges and corners with a brush before rolling
Cutting in means carefully painting edges, corners, trim, and ceiling lines with a brush before rolling the main field of the wall.
Which paint sheen has the lowest light reflectance?
Answer: Flat or matte
Flat or matte paint has the lowest sheen level and absorbs light rather than reflecting it, which helps hide surface imperfections.