Before a mobile crane operator accepts a lift assignment, the operator MUST verify:
Answer: The weight of the load and rigging, the pick radius, and the crane configuration capacity
The operator must confirm that the total load (load + rigging) at the intended radius does not exceed the crane's rated capacity in its configured setup.
A crane operator receives conflicting hand signals from two different signalers during a critical lift. The operator should:
Answer: Stop all movement immediately and do not resume until one designated signaler is identified
ASME B30.5 and OSHA require that only one designated signaler direct crane operations; conflicting signals require an immediate stop.
What is the primary reason a mobile crane's outrigger pads are used?
Answer: To distribute the outrigger load over a larger ground surface area
Outrigger pads spread the concentrated point load from the outrigger float over a larger area to prevent ground penetration and crane settlement.
A 'critical lift' under NCCCO and ASME B30.5 standards is typically defined as any lift that exceeds what percentage of the crane's rated capacity?
Answer: 75%
ASME B30.5 defines a critical lift as one that exceeds 75% of the crane's rated capacity or involves other defined risk factors.
Which of the following best describes 'two-blocking' on a mobile crane?
Answer: The upper and lower load blocks making contact, causing potential wire rope failure
Two-blocking occurs when the hook block contacts the boom tip or upper block, which can snap the wire rope and drop the load.
When a mobile crane is traveling on a public road, the boom should be:
Answer: Lowered and secured in the travel position per the manufacturer's specification
The boom must be lowered and locked in the manufacturer-specified travel position to maintain stability and comply with height restrictions.
The term 'net capacity' on a mobile crane load chart refers to:
Answer: The rated capacity minus the weight of the hook block, ball, and all rigging
Net capacity is the weight available for the actual load after subtracting all below-the-hook rigging hardware weight from the rated capacity.