Quality Control & Process Improvement Flashcards
7 cards from real MEOC practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 7 Quality Control & Process Improvement flashcards as text
During a post-project quality review, the team discovers that trench wall collapses occurred more frequently in sandy soil than in clay. This relationship is best analyzed using a:
Answer: Scatter diagram correlating soil type with collapse frequency
A scatter diagram plots two variables against each other to reveal whether a correlation exists, making it ideal for comparing soil type to collapse frequency.
What is the primary benefit of standardizing mini excavator pre-shift inspection procedures across an entire fleet?
Answer: It ensures consistent quality data collection, enabling meaningful fleet-wide comparisons and trend analysis
Standardized procedures produce comparable data across machines and operators, which is essential for identifying systemic issues versus one-off problems.
An operator is told to implement 'error-proofing' (poka-yoke) on a repetitive bucket attachment change. An example of this would be:
Answer: Designing a color-coded pin that only fits one orientation of the quick coupler
Poka-yoke devices make it physically impossible or immediately obvious when an error is about to occur, eliminating reliance on memory or attention.
Which metric directly indicates whether a mini excavator is being used productively versus sitting idle?
Answer: Overall Equipment Effectiveness (OEE)
OEE combines availability, performance, and quality into a single score that reveals how productively a machine is being utilized during scheduled time.
A quality improvement team wants to reduce hydraulic fluid contamination in mini excavators. The most effective way to verify the improvement after a change is made is to:
Answer: Collect fluid samples before and after the change and compare particle count data
Objective before-and-after data (fluid particle counts) provides measurable evidence that the change actually reduced contamination.
When completing a quality non-conformance report (NCR) for an excavation that missed the specified grade, the operator should include:
Answer: The location, magnitude of deviation, probable cause, and corrective action taken
A complete NCR captures what happened, how far off it was, why it happened, and how it was fixed, providing a full record for quality improvement.
In continuous improvement terms, 'value-added' excavation activity is best defined as:
Answer: A step that directly transforms the work product in a way the customer requires and is willing to pay for
Value-added work is defined from the customer's perspective: it must change the product, be done right the first time, and be something the customer actually values.