Excavation Techniques & Site Management Flashcards

7 cards from real MEOC practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 7 Excavation Techniques & Site Management flashcards as text
  1. When excavating in wet or saturated soil, what operational adjustment should a mini excavator operator make?

    Answer: Reduce bucket fill percentage and take smaller passes

    Saturated soil is heavier and less stable, so smaller bucket loads prevent overloading and machine tipping.

  2. What is 'daylight benching' in the context of excavation site management?

    Answer: Stepping back trench walls in horizontal tiers to increase stability

    Daylight benching cuts horizontal steps into trench walls to reduce wall height and improve overall stability.

  3. During excavation, you uncover what appears to be an unmarked utility line not shown on the site drawings. What is your immediate action?

    Answer: Stop work, back away, and notify the site supervisor immediately

    An unmarked utility is treated as live and dangerous; work must stop and the supervisor must be notified before any further action.

  4. What is the correct method for excavating a bell-bottom pier hole with a mini excavator?

    Answer: Drill straight down and flare outward at the base with a specialty attachment

    Bell-bottom piers require a drilling attachment that can underream the base to the required diameter below grade.

  5. A project specification requires 95% Proctor compaction on backfill. What does this mean for the excavation operator?

    Answer: Backfill must be placed in lifts and tested for density before the next lift

    Achieving 95% Proctor density requires placing backfill in controlled lifts and verifying compaction with a density test before proceeding.

  6. What is the safest approach for excavating next to an existing building foundation?

    Answer: Excavate in short parallel passes maintaining a safe distance, working inward gradually

    Gradual inward excavation in short passes limits the amount of soil removed from any one area at a time, reducing risk of foundation settlement.

  7. How should a mini excavator operator handle a boulder encountered during normal soil excavation?

    Answer: Assess size, then use a hydraulic hammer attachment or call for specialized equipment if needed

    Proper boulder removal requires assessing size and using the correct attachment; improper technique risks machine damage or tipping.