Supply Chain Management Flashcards

6 cards from real Manufacturing and Production practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 6 Supply Chain Management flashcards as text
  1. What does MRP stand for in manufacturing?

    Answer: Material Requirements Planning

    Material Requirements Planning is a system that calculates the materials and components needed for manufacturing based on demand forecasts and bills of materials.

  2. The Bill of Materials (BOM) in manufacturing is:

    Answer: A structured list of components, subassemblies, and raw materials required to build a product

    A BOM defines all materials, parts, and subassemblies needed to manufacture a finished product along with quantities.

  3. Lead time in supply chain management is:

    Answer: The time between placing an order and receiving it

    Lead time is the elapsed time from placing an order to receiving the goods, a critical factor in inventory planning.

  4. What is a Tier 1 supplier?

    Answer: A supplier that sells directly to the manufacturer or OEM

    Tier 1 suppliers provide components or assemblies directly to the OEM or primary manufacturer.

  5. What does 3PL stand for?

    Answer: Third-Party Logistics

    Third-Party Logistics (3PL) refers to outsourcing logistics functions such as warehousing, transportation, and fulfillment to a specialized provider.

  6. A supplier scorecard is primarily used to:

    Answer: Measure and track supplier performance across quality, delivery, and cost metrics

    Supplier scorecards provide objective, data-driven performance ratings to manage relationships and drive supplier improvement.