  1. The '5S' methodology stands for Sort, Set in Order, Shine, Standardize, and:

    Answer: Sustain

    The fifth S is Sustain, which ensures the other four steps are maintained and become part of daily routine.

  2. What is 'poka-yoke' designed to do?

    Answer: Prevent errors or make them immediately obvious

    Poka-yoke is an error-proofing technique that prevents defects by making it impossible or difficult to make mistakes.

  3. In lean, 'overproduction' is considered the worst waste because:

    Answer: It generates all other wastes by producing more than needed

    Overproduction leads to excess inventory, transportation, storage costs, and masks other process problems.

  4. Which lean concept involves producing one unit at a time through a sequence of operations?

    Answer: One-piece flow

    One-piece flow moves single units through production steps sequentially, reducing WIP and lead times.

  5. A 'pull system' in lean manufacturing means:

    Answer: Production is triggered by actual customer demand

    In a pull system, downstream demand signals upstream processes to produce, preventing overproduction.

  6. What is 'heijunka' in lean manufacturing?

    Answer: Production leveling to smooth out demand variation

    Heijunka is the practice of leveling production volume and mix over time to reduce variability and waste.