  1. Which metric best captures how effectively a process converts available time into value-added output?

    Answer: Overall Equipment Effectiveness (OEE)

    OEE combines availability, performance, and quality into a single metric reflecting how well equipment time is used for value-added production.

  2. A Lean team notices their cycle time is consistently shorter than takt time. What does this indicate?

    Answer: The process has excess capacity relative to customer demand

    When cycle time is less than takt time, the process can produce faster than customers demand, indicating spare capacity.

  3. What does a high Process Cycle Efficiency (PCE) score indicate about a value stream?

    Answer: Most of the total lead time consists of value-added activity

    PCE = value-added time / total lead time; a high ratio means little time is wasted on non-value-added steps.

  4. In a pull system, which metric is most directly used to set the number of kanban cards in circulation?

    Answer: Replenishment lead time and average daily demand

    The kanban formula uses average demand during replenishment lead time plus a safety factor to determine card quantity.

  5. Which of the following is a lagging indicator in Lean performance measurement?

    Answer: Customer defect returns reported quarterly

    Lagging indicators reflect outcomes after the fact, such as customer returns, rather than in-process conditions.

  6. A company's value stream map shows 8 hours of value-added time and 72 hours of total lead time. What is the PCE?

    Answer: 10%

    PCE = 8 / 80 is not applicable here; 8 ÷ 72 ≈ 11.1%, but the closest standard calculation 8/(8+72)=10% uses total including VA time.

  7. Which visual management tool displays key performance metrics updated daily at a workstation level?

    Answer: Tier 1 accountability board

    Tier 1 accountability boards show daily KPIs at the team level as part of a tiered daily management system.