Under OSHA 29 CFR 1926.405, what is the maximum allowable length for a temporary power cord on a construction site before a ground-fault circuit interrupter (GFCI) is required?
Select your answer
A
There is no length limit; GFCIs are always required for temporary wiring
B
25 feet
C
50 feet
D
100 feet