  1. A project team is performing an energy simulation for LEED. The proposed design shows 25% energy cost savings over the ASHRAE 90.1 baseline. What LEED EA Optimize Energy Performance point level does this typically correspond to in LEED v4 BD+C New Construction?

    Answer: 4 points

    In LEED v4 BD+C New Construction, approximately 25% energy cost savings over the ASHRAE 90.1 baseline earns around 4 points on the sliding scale.

  2. Under LEED Enhanced Commissioning, what is the purpose of an 'envelope commissioning' scope?

    Answer: To verify that the building envelope performs as intended to control heat transfer, air infiltration, and moisture

    Envelope commissioning verifies that the building envelope systems (walls, roof, windows) perform as designed to control heat, air, and moisture movement.

  3. What is the significance of the 'Basis of Design' (BOD) document in the LEED commissioning process?

    Answer: It documents the design approach, assumptions, and strategies used to meet the Owner's Project Requirements

    The BOD documents the design team's approach, assumptions, and rationale for how the design will meet the OPR, bridging owner requirements and design decisions.

  4. Under LEED v4 EA, which system type is specifically excluded from the refrigerant calculations in Enhanced Refrigerant Management?

    Answer: Small HVAC units with less than 0.5 pounds of refrigerant charge

    LEED Enhanced Refrigerant Management excludes small HVAC units with less than 0.5 lbs of refrigerant charge from the calculation requirements.

  5. A project installs 200 kW of on-site photovoltaic solar panels. Under which LEED EA credit would this renewable energy system earn points?

    Answer: EA Credit: Renewable Energy Production

    EA Credit: Renewable Energy Production awards points for on-site renewable energy systems, with points scaling based on the percentage of total building energy produced.

  6. In LEED energy modeling, process energy loads (such as computers, office equipment, and plug loads) are treated differently from regulated energy. How are they typically handled?

    Answer: Process loads are held constant and equal in both the baseline and proposed design models

    Process loads are kept equal in both baseline and proposed models so that the energy savings percentage reflects only regulated building system improvements, not equipment choices.

  7. Which LEED EA credit encourages projects to install permanent metering for at least the following end uses: lighting, plug loads, HVAC, and domestic hot water?

    Answer: EA Credit: Advanced Energy Metering

    Advanced Energy Metering requires sub-metering of individual energy end uses (lighting, HVAC, plug loads, etc.) to enable detailed energy tracking and fault detection.