โ† All Lean Six Sigma Yellow Belt Certification Flashcard Decks

The Improve Phase Flashcards

7 cards from real Lean Six Sigma Yellow Belt Certification practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 7 The Improve Phase flashcards as text
  1. A team wants to implement mistake-proofing on an assembly line. What Lean term describes this approach?

    Answer: Poka-yoke

    Poka-yoke refers to mistake-proofing devices or methods that prevent errors or make defects immediately detectable.

  2. During solution implementation, which stakeholder communication approach is most effective for reducing resistance?

    Answer: Involving key stakeholders early and updating them throughout the process

    Engaging stakeholders early and maintaining ongoing communication builds trust and reduces resistance to change.

  3. A Yellow Belt team proposes increasing inventory buffers to prevent stockouts. A lean practitioner would likely challenge this because:

    Answer: Excess inventory is considered a waste that hides other process problems

    Lean views excess inventory as waste (muda) because it consumes space and capital while masking underlying process instability.

  4. What does a 'future state' value stream map represent in the Improve phase?

    Answer: The ideal process design after waste is eliminated

    The future state map depicts the redesigned process with waste removed, serving as the implementation target.

  5. A team runs an A/B test comparing two process configurations. After the test, the new configuration shows a statistically significant improvement. What should be the next step?

    Answer: Develop an implementation plan to roll out the improved configuration

    Once a solution is validated with statistical significance, the team should plan and execute full-scale implementation.

  6. Which of the following best describes a 'pull system' in Lean production?

    Answer: Downstream processes signal upstream processes to produce only what is needed

    A pull system uses downstream demand signals (like kanban cards) to trigger upstream production, reducing overproduction.

  7. When implementing a solution, what is the primary reason for documenting the new standard operating procedure (SOP)?

    Answer: To ensure the improvement is consistently applied and gains are sustained

    SOPs capture the improved method so every operator performs the process the same way, sustaining the gains over time.