  1. A Green Belt notices that a process produces more defects on Monday mornings than other times. Which stratification analysis should be performed first?

    Answer: Time-based stratification by shift and day

    Time-based stratification breaks data into segments (shift, day, week) to reveal patterns linked to specific conditions like Monday morning starts.

  2. In hypothesis testing for a Green Belt project, a p-value of 0.03 is obtained with α = 0.05. What is the correct conclusion?

    Answer: Reject the null hypothesis

    Since p-value (0.03) < α (0.05), there is sufficient evidence to reject the null hypothesis.

  3. Which tool is BEST used to quantify the relationship strength between a continuous X variable and a continuous Y variable during the Analyze phase?

    Answer: Pearson correlation coefficient

    Pearson correlation coefficient measures the strength and direction of a linear relationship between two continuous variables.

  4. A team uses a multi-vari chart and finds that variation is greatest between different machines compared to within-machine or time-based variation. This indicates which type of variation source?

    Answer: Positional variation

    Variation between different machines (or positions/fixtures) is classified as positional variation in a multi-vari study.

  5. During the Analyze phase, a team wants to determine whether training (yes/no) affects defect rate (defective/not defective). Which statistical test is most appropriate?

    Answer: Chi-square test of independence

    Chi-square test of independence is used when both the input and output variables are categorical (attribute data).

  6. What does a steep slope on a Pareto chart's cumulative percentage line early in the chart indicate?

    Answer: A few categories account for the majority of defects

    A steep early cumulative line confirms the 80/20 principle — a few categories drive most of the defects.

  7. In regression analysis, a coefficient of determination (R²) of 0.85 means:

    Answer: 85% of the variation in Y is explained by the X variable(s) in the model

    R² represents the proportion of variance in the response variable (Y) that is explained by the predictor variable(s) in the regression model.