Lean Six Sigma Black Belt Certification Practice Test
Lean Six Sigma Black Belt Certification Lean Six Sigma Black Belt Control Phase: SPC Questions and Answers 2
A process has an X-bar chart with UCL = 50.5, CL = 50.0, and LCL = 49.5.
If a single point plots at 50.7, what is the correct interpretation?
Select your answer
A
The process is in statistical control
B
The process has a special cause variation
C
The point is within specification limits so no action is needed
D
The control limits need to be recalculated
Hint