What should the project include about emergency arrangements?
Answer: The adequacy of existing emergency procedures, equipment, and trained personnel relevant to the identified hazards
The project should assess whether existing emergency arrangements are adequate for the identified hazards. This includes: emergency procedures, fire safety provisions, first aid arrangements, spill response, evacuation procedures, and whether sufficient trained personnel are available.
How should the risk assessment project address training needs?
Answer: By identifying where additional training is needed to ensure workers can manage the identified risks effectively
The project should identify training gaps related to the identified risks — where workers need additional knowledge or skills to work safely, use controls correctly, recognise hazards, or respond to emergencies. Training recommendations should be specific, targeted, and proportionate to the risks.
What is the value of including a site plan or layout in the risk assessment project?
Answer: It helps readers understand the workplace layout, location of hazards, emergency routes, and the spatial relationships between work areas
A site plan or layout diagram adds significant value: it shows where hazards are located, how work areas relate to each other, traffic routes, emergency exits, and the spatial context for the assessment. It helps readers who are unfamiliar with the workplace understand the assessment.
How should the project handle hazards that cannot be eliminated?
Answer: Apply the hierarchy of control systematically — substitution, engineering controls, administrative controls and PPE — to reduce the risk to as low as reasonably practicable
When elimination is not reasonably practicable, the assessor should work down the hierarchy: can the hazard be substituted? Can engineering controls reduce exposure? Can administrative controls (procedures, training, supervision) manage the risk? PPE should only be recommended as a last resort or supplementary measure.
What makes a risk assessment project 'suitable and sufficient'?
Answer: It identifies all significant hazards, considers who is at risk, evaluates risks properly, recommends appropriate controls, and is kept up to date
A suitable and sufficient risk assessment: addresses all significant hazards (not trivial ones), considers everyone who might be affected, evaluates risks using an appropriate methodology, recommends proportionate controls, is understandable, and includes arrangements for review and update.
How should the project conclude?
Answer: With a summary of key findings, prioritised recommendations, the action plan, and a statement about review and monitoring arrangements
An effective conclusion summarises: the key hazards found, the most important recommendations (prioritised by risk), the action plan with responsibilities and timescales, arrangements for monitoring effectiveness, and the date for the next review. It should give the reader a clear picture of what needs to happen next.