IT Project Management Principles Flashcards
6 cards from real IKM practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 6 IT Project Management Principles flashcards as text
What is the critical path in project management?
Answer: Longest sequence of dependent tasks determining minimum duration
The critical path determines the shortest possible project duration; delays on it delay the project.
What is scope creep?
Answer: Uncontrolled expansion of scope without adjusting time or cost
Scope creep is uncontrolled growth through incremental unapproved changes.
Which methodology uses time-boxed sprints?
Answer: Scrum
Scrum uses fixed-length sprints (2-4 weeks) to deliver product increments.
What is a Work Breakdown Structure (WBS)?
Answer: Hierarchical decomposition of deliverables into work packages
WBS breaks total scope into manageable work packages for planning and estimation.
What is earned value management (EVM)?
Answer: Measuring performance by comparing planned work, completed work, and actual costs
EVM integrates scope, schedule, and cost data for objective performance measurement.
What is a project charter?
Answer: Formal authorization document with initial requirements and stakeholders
A charter formally authorizes the project, names the PM, and documents high-level requirements.