IEC - Independent Electrical Contractors Practice Test
IEC - Independent Electrical Contractors Overcurrent Protection Questions and Answers
According to NEC® 240.21, where must an overcurrent protective device (OCPD) be located in a circuit?
Select your answer
A
At the point where the conductor to be protected receives its supply.
B
At the midpoint of the branch circuit.
C
Within 3 feet of the load.
D
Only within the main service panel.
Hint