Practice Test Geeks home

FS - Fundamentals of Surveying Surveying Processes and Methods Questions and Answers

In a differential leveling circuit, a surveyor starts on a benchmark with a known elevation of 100.00 ft.
The first backsight reading is 4.56 ft, and the first foresight reading to a turning point is 3.21 ft.

What is the elevation of the turning point?

Select your answer