  1. What is the formula for calculating the area of a triangular parcel using base and height?

    Answer: Area = (base x height) / 2

    The area of a triangle equals one-half of the product of its base and perpendicular height.

  2. In construction staking, what is the purpose of an offset stake?

    Answer: To mark a reference point offset from the actual feature so it survives excavation

    Offset stakes are placed a set distance away from the actual construction feature so they are not destroyed when digging or grading begins.

  3. What does a contour interval of 2 feet on a topographic map indicate?

    Answer: Each contour line represents a 2-foot change in elevation

    The contour interval is the consistent vertical elevation difference between adjacent contour lines on a topographic map.

  4. What does an as-built survey document?

    Answer: The actual constructed positions and elevations of completed improvements

    An as-built survey records the true final locations, dimensions, and elevations of constructed features, which may differ from design drawings.

  5. What is the significance of a 1:1 slope in cut-slope design?

    Answer: For every 1 foot of vertical drop, the slope extends 1 foot horizontally

    A 1:1 slope means the horizontal run equals the vertical rise, resulting in a 45-degree angle typical for stable cohesive soils.

  6. Which method is used to transfer an elevation from a benchmark to a distant point using a series of intermediate setups?

    Answer: Differential leveling (fly leveling)

    Differential leveling uses a series of backsight and foresight readings through multiple instrument setups to carry an elevation over long distances.