Preventive Maintenance Schedules Flashcards
7 cards from real CST practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 7 Preventive Maintenance Schedules flashcards as text
How often should PTZ camera lubrication and mechanical movement checks typically be performed?
Answer: Quarterly
PTZ camera mechanical components such as gears and motors should be inspected and lubricated on a quarterly basis to prevent premature wear.
Which document should a technician reference to determine the manufacturer-recommended cleaning interval for a camera dome housing?
Answer: Installation manual or maintenance guide
The manufacturer's installation manual or maintenance guide specifies recommended cleaning intervals specific to the equipment model.
A maintenance log shows a DVR's hard drive has been in continuous operation for 3 years. What preventive action is most appropriate?
Answer: Plan for hard drive replacement
Hard drives have a finite operational lifespan, and proactive replacement after 3 years of continuous use prevents unexpected recording loss.
What is the primary purpose of checking camera IR illuminator output during a preventive maintenance visit?
Answer: To verify adequate low-light imaging performance
IR illuminators degrade over time, so verifying output ensures the camera maintains effective night-vision coverage.
During a scheduled PM, a technician finds condensation inside an outdoor camera enclosure. What is the correct response?
Answer: Dry the enclosure, inspect for seal failure, and replace gaskets if needed
Condensation indicates a compromised seal; drying the unit and replacing failed gaskets prevents moisture damage to internal electronics.
Which NVR/DVR maintenance task is best performed during a low-traffic recording period?
Answer: Firmware updates and system reboots
Firmware updates and system reboots briefly interrupt recording, so scheduling them during low-activity periods minimizes potential gaps in coverage.
A PM schedule calls for verifying UPS battery backup for surveillance equipment. What is the most important test parameter to check?
Answer: Battery runtime under load
Battery runtime under load confirms the UPS can sustain surveillance equipment for the required duration during a power outage.