CSI Testing & Quality Assurance Flashcards
6 cards from real CSI practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 6 CSI Testing & Quality Assurance flashcards as text
Which testing phase validates that integrated systems exchange data correctly and meet business requirements before go-live?
Answer: User Acceptance Testing (UAT)
UAT is the final validation phase where end-users confirm that integrated systems meet business requirements before production deployment.
A system integrator must verify that two enterprise applications exchange messages without data loss. Which testing approach is most appropriate?
Answer: End-to-end integration testing
End-to-end integration testing validates complete message flows across system boundaries to ensure no data is lost in transit.
What is a 'test harness' in the context of system integration testing?
Answer: A collection of stubs and drivers that simulate system components
A test harness is a framework of stubs and drivers used to simulate missing or unavailable components during integration testing.
During integration testing, a 'stub' is used to:
Answer: Simulate a downstream component that is not yet available
A stub simulates a downstream dependency, returning predetermined responses so the component under test can be validated independently.
Which defect classification indicates a critical system integration failure that blocks all further testing?
Answer: Blocker/Showstopper
A blocker or showstopper defect halts the entire testing effort because the core integration path cannot function until it is resolved.
What does 'traceability matrix' provide in a CSI testing project?
Answer: Mapping between requirements and corresponding test cases
A traceability matrix maps each business requirement to one or more test cases, ensuring complete test coverage.