Technology & Tools Flashcards
7 cards from real CPS practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 7 Technology & Tools flashcards as text
Which type of software tool is specifically designed to model 'as-is' and 'to-be' business processes using standardized notation?
Answer: Business process modeling and notation (BPMN) tool
BPMN tools provide standardized graphical notation specifically designed to model current and future-state business processes.
A process specialist applies mistake-proofing (poka-yoke) using technology. Which example best represents a digital poka-yoke?
Answer: A data entry form that prevents submission unless all required fields are completed
Required field validation that blocks form submission is a digital poka-yoke that prevents errors at the point of data entry.
What advantage does cloud-based process documentation offer over locally stored documentation?
Answer: It provides real-time accessibility and collaboration across locations
Cloud-based documentation enables teams in different locations to access, edit, and collaborate on process documents simultaneously.
In process improvement, what is the role of a 'digital twin' technology?
Answer: Creating a virtual replica of a process to simulate changes before implementation
A digital twin creates a virtual simulation of a physical process or system, allowing teams to test changes risk-free before real-world implementation.
Which data visualization tool is most effective for showing the distribution and spread of process cycle time data?
Answer: Histogram
Histograms display the frequency distribution of continuous data like cycle time, revealing spread, central tendency, and shape of the distribution.
A CPS practitioner is implementing API integrations between process tools. What does API stand for in this context?
Answer: Application Programming Interface
An Application Programming Interface (API) defines how software applications communicate and exchange data with each other.
When a control chart shows a 'run of eight' consecutive points on one side of the centerline, what does this signal?
Answer: A non-random pattern indicating a likely process shift
Eight consecutive points on one side of the centerline is a Western Electric rule violation indicating a non-random shift in the process mean.