Emergency Planning and Crisis Management Flashcards
7 cards from real CPP practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 7 Emergency Planning and Crisis Management flashcards as text
What is the primary objective of Business Continuity Planning (BCP)?
Answer: To ensure critical business functions can continue during and after a disruption
BCP aims to ensure that critical business functions can continue operating with minimal interruption during and after any type of disruptive event.
What does the Recovery Time Objective (RTO) define in business continuity planning?
Answer: The maximum acceptable downtime before a business function must be restored
RTO defines the maximum tolerable downtime for a critical business function, establishing the deadline by which that function must be restored after a disruption.
The Recovery Point Objective (RPO) in business continuity planning refers to:
Answer: The maximum acceptable amount of data loss measured in time
RPO defines the maximum acceptable data loss measured in time, determining how frequently data must be backed up to meet recovery requirements.
What is a 'hot site' in business continuity planning?
Answer: A fully equipped alternate facility that can be activated immediately after a disruption
A hot site is a fully operational alternate facility with all necessary hardware, software, and connectivity that can be activated immediately or within hours of a primary site failure.
What is the primary purpose of a Business Impact Analysis (BIA)?
Answer: To identify critical business functions and quantify the impact of their disruption
A BIA identifies which business functions are critical, determines the operational and financial impact of their disruption, and establishes recovery priorities and time objectives.
Which international standard specifically governs Business Continuity Management Systems?
Answer: ISO 22301
ISO 22301 is the international standard that specifies requirements for planning, establishing, implementing, and improving a Business Continuity Management System.
In business continuity planning, what characterizes a 'warm site'?
Answer: A site with basic infrastructure already in place requiring equipment installation and configuration before use
A warm site has basic infrastructure such as power, network connectivity, and space pre-installed, but requires additional equipment setup before becoming operational, typically within 24 to 72 hours.