Lean Manufacturing and Just-In-Time (JIT) Principles Flashcards
7 cards from real CPIM practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Lean Manufacturing and Just-In-Time (JIT) Principles flashcards as text
Which of the following best describes the primary goal of a Just-In-Time (JIT) production system?
Answer: Produce and deliver items only when needed in the quantities needed
JIT aims to produce and deliver the right items in the right quantity at the right time, eliminating waste from overproduction and excess inventory.
In lean terminology, which Japanese term refers to the relentless pursuit of waste elimination and continuous improvement?
Answer: Kaizen
Kaizen means 'change for better' and represents the lean philosophy of continuous, incremental improvement involving all employees.
The seven wastes (muda) identified in the Toyota Production System do NOT include which of the following?
Answer: Strategic planning
The seven wastes are overproduction, waiting, transportation, over-processing, inventory, motion, and defects — strategic planning is a management activity, not a waste category.
A kanban card system is primarily used to:
Answer: Signal the need to replenish or produce a specific quantity of an item
Kanban cards serve as visual signals that authorize and trigger the replenishment or production of a set quantity of parts or materials.
Which lean concept involves leveling production volume and mix over a planning period to reduce variability?
Answer: Heijunka
Heijunka is the practice of leveling the type and quantity of production over a fixed time period to reduce unevenness (mura) and overburden (muri).
What is the concept of 'takt time' in lean manufacturing?
Answer: The average time available per unit to match production rate to customer demand
Takt time is calculated as available production time divided by customer demand rate, setting the pace at which products must be completed to satisfy demand.
In a lean pull system, production is triggered by:
Answer: Actual downstream consumption or customer demand signals
In a pull system, each production stage is triggered only when the downstream stage signals a need, ensuring work is produced in response to actual demand rather than forecasts.