What is the correct passive Profibus bus termination network configuration?
Select your answer
A
A single 120 Ω resistor across A and B lines
B
390 Ω pull-up to +5V, 220 Ω across A-B, 390 Ω pull-down to GND
C
Two 75 Ω resistors in parallel to ground
D
A single 220 Ω resistor from A to B with no biasing