  1. What does CPCS stand for? → Construction Plant Competence Scheme
  2. What must a plant operator do if they are unsure whether a service has been correctly identified and isolated before excavation? → Stop work and contact the supervisor — do not proceed until confirmation is received
  3. Under PUWER, when must a risk assessment for plant use be reviewed? → When there is reason to believe it is no longer valid or after a significant change
  4. What does LOLER require regarding the competence of the appointed person for a lifting operation? → They must be competent in planning and supervising lifting operations
  5. A pre-use check reveals the machine's horn is not functioning. What should the operator do? → Take the plant out of service and report the defect
  6. What is the risk of operating plant on a slope steeper than the manufacturer's specified gradient? → The plant may overturn laterally or tip forward, causing serious injury or death
  7. What hazard is created when an excavator operates near overhead power lines? → Risk of electrocution through arcing or direct contact
  8. Which document provides the written authority for a lifting operation to proceed, detailing the method, equipment, personnel and hazards? → A lifting plan or method statement
  9. What does 'duty of care' mean for a crane operator under LOLER? → The operator must take reasonable care to ensure lifting operations are carried out safely
  10. A site manager asks a plant operator to use equipment outside its rated capacity. What should the operator do? → Refuse and report the request to the appropriate authority
  11. What is the primary purpose of a pre-use check on construction plant? → To identify defects or hazards before operation begins
  12. Under PUWER, what must be recorded following a plant inspection? → The results of the inspection and any remedial actions required
  13. Which colour CPCS card indicates a trained operator who has not yet achieved full competency? → Red
  14. How often must lifting equipment that is used for lifting persons be thoroughly examined under LOLER? → Every 6 months
  15. What is the function of the excavator's slew brake? → It controls and stops the rotation of the upper structure
  16. Who is the 'Appointed Person' in a crane lifting operation under BS 7121? → The person responsible for planning and directing the lifting operation
  17. What does a blue CPCS card indicate about the holder? → They are a trained operator working towards their NVQ
  18. What should an operator do before tipping a load at a spoil heap or trench edge? → Ensure stop blocks are in place and approach cautiously at a safe distance from the edge
  19. What is an exclusion zone in the context of a lifting operation? → An area below and around the lift from which all non-essential personnel are excluded
  20. Which regulation specifically requires that guards are fitted to dangerous parts of construction plant? → PUWER Regulation 11
  21. What colour represents electrical services (high voltage) in the UK underground colour coding? → Red
  22. What does LOLER stand for? → Lifting Operations and Lifting Equipment Regulations 1998
  23. What colour represents a gas pipe in UK underground service identification? → Yellow
  24. What does RIDDOR require in relation to construction plant incidents? → Certain serious injuries, dangerous occurrences, and fatalities must be reported
  25. What is the correct boom position when travelling a tracked excavator across site? → Boom retracted with bucket low to the ground, just above surface level
  26. A plant operator is working near a communications cable (telephone/data). What colour identifies this type of service? → Grey or purple
  27. What is the correct procedure for picking up a pallet of bricks with a telehandler fitted with forks? → Approach slowly, insert forks fully under the load, tilt back slightly, then raise
  28. In what situation should a forward tipping dumper never be used? → To transport persons in the skip or anywhere other than the operator's seat
  29. What is the correct procedure before slewing an excavator with a loaded bucket? → Check the swing area is clear of personnel and obstructions
  30. What does the CPCS category A09 relate to? → Excavator — 360 degrees