โ† All CLC Flashcard Decks

Laboratory Operations & Quality Management Flashcards

7 cards from real CLC practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 7 Laboratory Operations & Quality Management flashcards as text
  1. A laboratory QC chart shows a trend of six consecutive QC values progressively increasing toward the upper control limit. Which Westgard rule has been violated?

    Answer: 6x trend rule

    The 6x trend rule (also called the 6T rule) is violated when six consecutive QC values move progressively in one direction, indicating a systematic trend.

  2. When validating a quantitative assay's linearity, which CLSI guideline should the laboratory follow?

    Answer: EP6-A

    CLSI EP6-A provides the protocol for evaluating the linearity of quantitative measurement procedures across the analytical measurement range.

  3. A laboratory director is implementing a quality indicator program. Which metric best monitors the pre-analytical phase of the testing process?

    Answer: Rate of hemolyzed specimens rejected per 1,000 specimens received

    Hemolysis rejection rate is a pre-analytical quality indicator that monitors specimen collection and handling quality before testing begins.

  4. A CLC is conducting a gap analysis before an accreditation inspection. The most efficient approach is to compare the laboratory's current practices against:

    Answer: The applicable accreditation standards and regulatory requirements checklist

    A gap analysis measures current practice against the specific requirements of the applicable accreditation standards to identify non-conformances before inspection.

  5. Under the HITECH Act, a laboratory must notify affected individuals of a breach involving unsecured PHI within:

    Answer: Without unreasonable delay and no later than 60 days after discovery

    HITECH requires notification without unreasonable delay and within 60 calendar days of discovery of a breach of unsecured PHI.

  6. A reference laboratory reports a critical potassium value of 6.8 mEq/L on a specimen submitted by a satellite clinic. Who is ultimately responsible for ensuring the critical value is communicated to the treating clinician?

    Answer: The ordering laboratory or clinic that submitted the specimen

    The ordering (sending) laboratory or clinic bears responsibility for critical value communication to the treating clinician when specimens are referred to a reference laboratory.

  7. A laboratory uses a lot-to-lot validation approach when changing QC material lots. The primary goal of this process is to:

    Answer: Establish new mean and SD target values appropriate for the new lot before patient testing resumes

    Lot-to-lot validation establishes laboratory-specific mean and SD values for the new QC lot by running it concurrently with the old lot before it becomes the primary QC material.