  1. Which organization administers the Landscape Architect Registration Examination (LARE) in the United States?

    Answer: Council of Landscape Architectural Registration Boards (CLARB)

    CLARB develops and administers the LARE, the national licensing examination required to become a registered landscape architect in most US states.

  2. Under what circumstance may a licensed landscape architect legally seal documents in a state where they are not licensed?

    Answer: Generally they may not — licensure is state-specific

    Landscape architects must hold a valid license in each state where they seal documents; practicing without a license is illegal regardless of experience.

  3. What does the term 'standard of care' mean in landscape architecture professional practice?

    Answer: The level of skill and diligence ordinarily exercised by competent practitioners under similar circumstances

    Standard of care is the legal benchmark against which a professional's conduct is measured — essentially, what a reasonable, competent practitioner would do in the same situation.

  4. A client asks a landscape architect to certify that construction was completed 'in substantial conformance' with the contract documents. What does this certification mean?

    Answer: The work generally conforms to the design intent with minor deviations

    Substantial conformance certification means the completed work generally follows the design intent; it does not mean every detail is perfect or that the LA provided continuous inspection.

  5. What is a 'Request for Information' (RFI) in the context of landscape architecture construction administration?

    Answer: A contractor's formal question about contract documents submitted to the design team for clarification

    An RFI is a written document from the contractor to the design team asking for clarification or additional information about the construction documents.

  6. Which delivery method has the owner contract separately with a designer and a contractor, with the designer typically managing construction administration?

    Answer: Design-bid-build

    In design-bid-build, the owner holds two sequential contracts — first with the designer, then with a contractor selected through competitive bidding.