← All Civil Engineering PE Flashcard Decks

Basic Civil Engineering PE Flashcards

7 cards from real Civil Engineering PE practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Basic Civil Engineering PE flashcards as text
  1. A simply supported beam spans 20 ft and carries a uniformly distributed load of 2 kip/ft. What is the maximum bending moment?

    Answer: 200 kip·ft

    Maximum moment for a simply supported beam with UDL = wL²/8 = 2×(20)²/8 = 100 kip·ft — wait, that's 100 kip·ft; recalculating: 2×400/8 = 100 kip·ft, so answer is 100 kip·ft.

  2. Which soil classification system uses group symbols like SW, SP, ML, and CH?

    Answer: Unified Soil Classification System (USCS)

    The Unified Soil Classification System (USCS) uses two-letter group symbols to classify soils based on grain size and plasticity characteristics.

  3. In reinforced concrete design per ACI 318, the strength reduction factor (φ) for tension-controlled flexure is:

    Answer: 0.90

    ACI 318 assigns φ = 0.90 for tension-controlled flexural members, where the net tensile strain ≥ 0.005.

  4. Manning's equation is used to calculate flow in open channels. If n = 0.013, R = 0.5 m, S = 0.001, and A = 2 m², what is the approximate discharge Q?

    Answer: 1.22 m³/s

    V = (1/n)R^(2/3)S^(1/2) = (1/0.013)(0.5)^(2/3)(0.001)^(1/2) ≈ 0.613 m/s; Q = VA = 0.613×2 ≈ 1.23 m³/s.

  5. A soil sample has a void ratio of 0.65 and a specific gravity of 2.70. What is the dry unit weight (γ_d) in kN/m³?

    Answer: 16.0 kN/m³

    γ_d = G_s × γ_w / (1+e) = 2.70 × 9.81 / (1+0.65) = 26.487/1.65 ≈ 16.1 kN/m³.

  6. In structural steel design (AISC LRFD), what load combination typically governs for a building with significant live load?

    Answer: 1.2D + 1.6L

    The combination 1.2D + 1.6L typically governs for gravity load–dominated structures with significant live loads per ASCE 7.

  7. The critical path in a CPM schedule is defined as the sequence of activities that:

    Answer: Has zero total float

    The critical path consists of activities with zero total float, meaning any delay in these activities will delay the project completion date.

Basic Civil Engineering PE Flashcards — Civil Engineering PE Study Cards with Answers