  1. What distinguishes a Master Plan from a Facility Assessment in healthcare construction planning?

    Answer: A Master Plan sets long-term development strategy; a Facility Assessment evaluates current physical and functional conditions

    A Facility Assessment evaluates the current state of a facility, while a Master Plan charts strategic growth and capital project sequencing over time.

  2. In a healthcare construction project, which scheduling method is best suited for sequencing complex, interdependent activities across multiple floors simultaneously?

    Answer: Critical Path Method (CPM) with activity precedence relationships

    CPM with precedence relationships (finish-to-start, start-to-start, etc.) accurately models complex interdependencies and identifies the true critical path.

  3. A hospital is constructing a new patient tower adjacent to the existing facility. What is the PRIMARY infection control concern during the site work and foundation phase?

    Answer: Dust and airborne particulate infiltration into the occupied building

    Excavation and earthwork generate large amounts of dust containing fungal spores (e.g., Aspergillus) that pose severe risks to immunocompromised patients if they infiltrate the existing facility.

  4. During value engineering on a healthcare project, a proposed substitution reduces first cost but has a higher life-cycle cost. How should the CHC present this trade-off to the owner?

    Answer: Present total cost of ownership analysis showing both first cost savings and long-term operational cost impact

    Value engineering evaluates life-cycle cost, not just first cost; presenting total cost of ownership allows the owner to make an informed decision.

  5. Which submittal type provides the contractor's planned approach for a specific work scope, such as concrete mix design or infection control, for the engineer's review?

    Answer: Method statement / Work plan

    A method statement or work plan details how the contractor intends to execute a specific activity, allowing the engineer or infection control officer to review the approach.

  6. What is the role of the Authority Having Jurisdiction (AHJ) during a healthcare construction project?

    Answer: To review, approve, and inspect the project for compliance with applicable codes and regulations

    The AHJ (typically the state health department and/or local building department) reviews plans, issues permits, and conducts inspections to ensure code compliance.

  7. A healthcare contractor is preparing a phasing plan for an occupied hospital renovation. Which factor MOST directly dictates the sequence of construction phases?

    Answer: Maintaining continuous patient care operations and department functionality