← All CHC Flashcard Decks

Healthcare Compliance & Regulations Flashcards

7 cards from real CHC practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Healthcare Compliance & Regulations flashcards as text
  1. A healthcare facility is undergoing a major renovation and must maintain fire watch. When is a fire watch typically required per NFPA 101?

    Answer: When an automatic fire suppression or detection system is impaired for more than 4 hours in a 24-hour period

    NFPA 101 requires fire watch when an automatic suppression or detection system is out of service for more than 4 hours within a 24-hour period in an occupied building.

  2. Which document establishes the infection control risk category (Class I–IV) for a specific healthcare construction project?

    Answer: The ICRA Matrix completed by the infection control team

    The ICRA Matrix—completed collaboratively by the facility's infection control practitioners and construction team—assigns a Class I through IV risk level based on patient population and construction activity type.

  3. A new hospital wing requires an emergency electrical system. Per NFPA 99 and NEC Article 517, how quickly must the essential electrical system (EES) transfer to backup power?

    Answer: Within 10 seconds

    NFPA 99 and NEC Article 517 require the life safety branch of the essential electrical system to restore power within 10 seconds of normal power failure.

  4. During construction in a healthcare facility, a utility outage affects the medical gas system. Who has primary authority to determine if patient areas can remain occupied?

    Answer: The hospital's clinical leadership and safety officer

    Clinical leadership and the facility safety officer hold authority to assess patient risk and determine whether areas can remain safely occupied during a utility impairment.

  5. Which federal regulation requires healthcare construction contractors to maintain Safety Data Sheets (SDS) on site for all hazardous chemicals used?

    Answer: OSHA Hazard Communication Standard (29 CFR 1910.1200)

    OSHA's Hazard Communication Standard (HazCom / 29 CFR 1910.1200) requires employers to maintain SDS for all hazardous chemicals and ensure worker access to that information.

  6. What is the primary compliance risk when a healthcare contractor fails to obtain a building permit before starting structural work?

    Answer: Potential stop-work orders, fines, and required demolition of unpermitted work

    Performing structural work without a required permit can result in stop-work orders, monetary fines, and orders to demolish non-permitted construction that cannot be inspected in place.

  7. Which section of The Joint Commission standards requires healthcare organizations to conduct an annual evaluation of the Environment of Care management plans?

    Answer: EC (Environment of Care) standards

    TJC's Environment of Care (EC) standards require the facility to annually evaluate the effectiveness of each EC management plan, including safety, security, and utilities management.