  1. In FM, 'total cost of ownership' (TCO) for a building asset includes which components?

    Answer: Purchase price plus ongoing operating and maintenance costs over its life

    TCO encompasses acquisition, operation, maintenance, and disposal costs across an asset's full lifecycle, providing a complete financial picture.

  2. What is the primary goal of a preventive maintenance (PM) program from a performance management perspective?

    Answer: To eliminate unplanned downtime and extend asset life

    PM programs proactively address wear and potential failures on a scheduled basis, reducing costly emergency repairs and extending useful asset life.

  3. A facility manager uses mean time between failures (MTBF) to evaluate which aspect of building systems?

    Answer: Equipment reliability

    MTBF measures the average operating time between equipment failures, serving as a key indicator of system reliability and maintenance effectiveness.

  4. Which IFMA tool is specifically designed to help facility managers collect and compare operational cost and utilization data?

    Answer: IFMA Benchmarking Survey

    IFMA's Benchmarking Survey collects FM cost, staffing, and utilization data from member organizations, allowing peer-to-peer performance comparison.

  5. Corrective maintenance is best defined as:

    Answer: Maintenance performed after a failure has occurred

    Corrective maintenance restores equipment to operational status after an unexpected failure, as opposed to preventive or predictive approaches.

  6. When a facility manager sets a target of 95% work order completion within SLA timeframes, this is an example of:

    Answer: A performance KPI threshold

    Defining a percentage completion target tied to SLA timeframes creates a measurable KPI that tracks service responsiveness and team accountability.