โ† All CET Flashcard Decks

Registry Operations & Management Flashcards

7 cards from real CET practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 7 Registry Operations & Management flashcards as text
  1. Under FCC regulations, which entity is responsible for ensuring that equipment bearing its FCC ID continues to comply with FCC rules after authorization is granted?

    Answer: The grantee (manufacturer/importer)

    The grantee is responsible for ongoing compliance of authorized equipment and must maintain records and ensure continued conformance.

  2. A technician is auditing a calibration registry and finds a gap in the chain of calibration records for a voltage reference. This gap is called:

    Answer: A traceability gap

    A traceability gap occurs when the unbroken chain of calibrations back to a national standard is interrupted, invalidating the reference's measurement integrity.

  3. Which FCC authorization procedure requires that a device be tested at an accredited laboratory (TCB) and receive a grant before it can be marketed?

    Answer: Certification

    Certification (formerly type acceptance) requires third-party testing by a Telecommunications Certification Body (TCB) and an FCC grant before marketing.

  4. In asset registry management, 'depreciation schedule' information is relevant because it:

    Answer: Supports financial reporting and replacement planning

    Depreciation schedules in a registry support financial accounting and help plan equipment replacement cycles before assets become unreliable.

  5. An electronics technician finds a device in the shop with no visible FCC ID. What is the most likely compliance issue?

    Answer: The device may have been sold without required FCC equipment authorization

    Devices subject to FCC authorization must display the FCC ID; absence of this marking suggests the device was marketed without obtaining required authorization.

  6. When a company changes the manufacturing location of an FCC-certified device but does not change its design, what must they do regarding the registry/authorization?

    Answer: File a Class I permissive change with the FCC

    A change in manufacturing location with no design change typically requires a Class I permissive change notification, which is the least burdensome change filing.

  7. In preventive maintenance registry systems, the term 'condition-based maintenance' (CBM) differs from time-based maintenance in that CBM:

    Answer: Is triggered by actual equipment condition data rather than fixed time intervals

    Condition-based maintenance uses real-time monitoring data (vibration, temperature, output parameters) to trigger maintenance only when indicators show need.