  1. Which condition would cause an inspector to classify a sediment basin as non-functional?

    Answer: Sediment accumulation reaching one-third of the basin's design storage capacity

    Most design standards require sediment basins to be cleaned when sediment accumulates to one-third of the design storage volume to maintain treatment capacity.

  2. What documentation must be retained on-site or made available during a regulatory inspection under the EPA CGP?

    Answer: The SWPPP, all inspection reports, and records of corrective actions

    The CGP requires that the SWPPP, all inspection reports, and corrective action records be retained and made available to regulators upon request.

  3. An inspector finds that a slope with disturbed soil has been left un-stabilized for 20 days without any temporary cover. The applicable CGP requires stabilization within 14 days. How should this be documented?

    Answer: As a corrective action item with the number of days past the stabilization deadline noted

    Exceeding the stabilization deadline is a permit violation that must be documented as a corrective action item, including the number of days the deadline has been exceeded.

  4. What is the purpose of a 'stabilized construction exit' at a site perimeter?

    Answer: To remove sediment and mud from vehicle tires before they access public roadways

    Stabilized exits use aggregate or other materials to dislodge and trap sediment from vehicle tires, preventing tracking of mud onto public roads.

  5. When evaluating the effectiveness of hydroseeding applied to a disturbed area, what is the minimum percent vegetative cover typically required before an area is considered 'finally stabilized'?

    Answer: 70% cover of native or non-invasive vegetation

    The EPA CGP defines final stabilization as achieving 70% vegetative cover of native or non-invasive species over all disturbed areas.

  6. During an inspection, a contractor claims that a BMP was installed correctly but a recent storm damaged it before the inspector's visit. What is the appropriate inspection response?

    Answer: Document the current condition as a deficiency and require corrective action regardless of cause

    Inspectors must document conditions as found; storm damage does not exempt a site from corrective action requirements since BMPs must be maintained to function during future storms.

  7. Which parameter is most useful for an inspector to record at a stormwater discharge point to quickly assess potential sediment impact without lab analysis?

    Answer: Visual color and clarity of the discharged water

    Visual assessment of water color and clarity is a quick field indicator of turbidity and suspended sediment that inspectors use at discharge points without lab equipment.