An inspector observes a rock check dam in a channel with a 4% grade.
The crest of the downstream dam is at the same elevation as the toe of the upstream dam.

Sediment has accumulated to approximately half the height of the downstream dam.

What is the most appropriate action for the inspector to recommend?

Select your answer