The 'planning fence' in master scheduling separates:
Answer: Fixed and flexible portions of the schedule
The planning fence divides the schedule into a frozen zone where changes are restricted and a flexible zone where planners can make adjustments.
Which demand pattern is characterized by a consistent upward or downward movement over time?
Answer: Trend
A trend pattern reflects a sustained long-term increase or decrease in demand, which must be incorporated into forecasting models.
Distribution Requirements Planning (DRP) is best described as:
Answer: Time-phased planning of inventory replenishment across a distribution network
DRP applies MRP logic to distribution networks, planning inventory replenishment from central warehouses to field locations over time.
What is 'option overplanning' in master scheduling?
Answer: Planning option quantities greater than 100% to account for forecast uncertainty across configurations
Option overplanning deliberately plans optional features at quantities slightly exceeding 100% to ensure component availability when customer configurations vary.
A 'hedge' in master planning refers to:
Answer: Inventory or capacity built in anticipation of uncertain future demand or supply events
In CPIM, a hedge is planned inventory or capacity created to protect against uncertainty such as a possible strike, supply disruption, or demand surge.
Which of the following is a primary input to the master production schedule?
Answer: The aggregate production plan
The aggregate production plan provides overall production targets by family that are disaggregated into the MPS for specific products.