  1. Which instrument is used to measure the airtightness of a building envelope?

    Answer: Blower door

    A blower door depressurizes the building to measure air leakage through the envelope.

  2. What does a lighting power density (LPD) calculation require?

    Answer: Total wattage of fixtures divided by floor area

    LPD is expressed in watts per square foot and equals total connected wattage divided by the conditioned floor area served.

  3. When benchmarking a facility's energy use, which metric normalizes consumption across buildings of different sizes?

    Answer: Energy Use Intensity (EUI)

    EUI divides annual energy consumption by gross floor area, enabling fair cross-building comparisons.

  4. A chiller log shows entering condenser water temperature consistently 5°F above design. What analytical step should an auditor take first?

    Answer: Compare actual vs. design cooling tower performance curves

    Elevated condenser water temperature usually indicates cooling tower degradation, so comparing actual vs. design tower performance is the correct diagnostic step.

  5. Which data source provides historical utility billing intervals that help identify demand spikes?

    Answer: Interval data from the utility meter

    Utility interval (15-minute or hourly) meter data captures the demand profile needed to identify peak demand events.

  6. What is the primary purpose of a degree-day analysis in energy auditing?

    Answer: Normalize energy consumption for weather variation across years

    Degree-day normalization adjusts utility data for heating and cooling weather differences, enabling year-over-year comparisons.

  7. During a walk-through audit, an auditor notices motor nameplate data shows 460V/3-phase but the panel schedule lists 480V. What should be recorded?

    Answer: The voltage discrepancy as a potential efficiency and reliability concern

    Voltage mismatches can affect motor performance and longevity, so both values should be documented and flagged for investigation.