  1. What is the key role of a Measurement & Verification (M&V) plan in an energy efficiency project?

    Answer: To quantify actual energy savings achieved compared to an established baseline after project implementation

    M&V establishes a pre-project baseline and uses defined protocols (such as IPMVP) to measure actual post-installation savings against that baseline.

  2. Under the GHG Protocol, which Scope covers emissions from purchased electricity consumed by a company?

    Answer: Scope 2

    Scope 2 covers indirect emissions from the generation of purchased electricity, steam, heat, or cooling consumed by the reporting company.

  3. A utility offers a 'Critical Peak Pricing' (CPP) tariff. How does this tariff structure incentivize demand reduction?

    Answer: It charges significantly higher rates during a limited number of pre-announced peak hours, incentivizing customers to reduce load

    CPP tariffs apply very high rates during designated critical peak hours (typically 10-15 days per year), creating a strong price signal to reduce consumption.

  4. What is the difference between 'market-based' and 'location-based' methods for reporting Scope 2 emissions?

    Answer: Market-based uses contractual instruments like RECs and green tariffs; location-based uses the average emission factor for the grid where electricity is consumed

    The GHG Protocol allows both methods: market-based reflects actual contractual choices (RECs, green tariffs), while location-based uses regional grid average emission factors.

  5. Which type of energy storage technology is most commonly paired with utility-scale renewable energy projects in the US to address intermittency?

    Answer: Lithium-ion battery energy storage systems (BESS)

    Lithium-ion BESS has become the dominant storage technology paired with utility-scale solar and wind due to falling costs and rapid deployment capability.

  6. In corporate sustainability reporting, what does the acronym 'TCFD' stand for and what does it primarily address?

    Answer: Task Force on Climate-related Financial Disclosures; it addresses how companies should disclose climate-related financial risks and opportunities

    TCFD provides a framework for companies to disclose climate-related risks and opportunities in financial filings, covering governance, strategy, risk management, and metrics.

  7. A facility procures electricity under a 'slice-of-system' PPA structure. What does this mean?

    Answer: The buyer purchases a proportional share of output from an existing renewable facility rather than a fixed price per MWh

    In a slice-of-system PPA, the buyer receives a percentage of total project output (variable MWh) rather than a fixed volume at a set price.