  1. Which metric is most commonly used to measure call-processing time efficiency in an emergency dispatch center?

    Answer: Average speed of answer (ASA)

    Average speed of answer (ASA) measures how quickly calls are answered and is a primary efficiency metric in dispatch QC.

  2. A QC supervisor discovers that a dispatcher consistently fails to verify the caller's callback number. What is the BEST corrective action?

    Answer: Provide targeted coaching and document the session

    Targeted coaching with documentation addresses the specific deficiency while creating a record for trend monitoring.

  3. When conducting a call review, a QC analyst notes the dispatcher gave the caller incorrect pre-arrival instructions. This error should be classified as:

    Answer: Protocol deviation

    Giving incorrect pre-arrival instructions constitutes a protocol deviation because it departs from established dispatch guidelines.

  4. Which quality improvement model uses the steps Define, Measure, Analyze, Improve, and Control?

    Answer: Six Sigma DMAIC

    Six Sigma's DMAIC framework provides a data-driven methodology for process improvement in high-stakes environments like dispatch.

  5. A dispatch center implements a new call-intake script. After 30 days, QC data shows longer handling times. What should management do FIRST?

    Answer: Collect additional data to determine if the trend is statistically significant

    Before making changes, management should gather enough data to confirm whether the increased handling time is a real trend or normal variation.

  6. Which of the following best describes a 'control chart' in the context of dispatch QC?

    Answer: A statistical tool that displays process variation over time against control limits

    A control chart plots performance data over time with upper and lower control limits to distinguish normal variation from special-cause variation.

  7. An emergency dispatch center's QC program finds a 15% protocol compliance rate drop over three months. The MOST appropriate next step is to:

    Answer: Conduct a root cause analysis to identify why compliance dropped

    A root cause analysis identifies the underlying factors driving the drop, enabling targeted and effective corrective measures.