Specification Writing Principles & MasterFormat Flashcards
7 cards from real CCS practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 7 Specification Writing Principles & MasterFormat flashcards as text
Which MasterFormat division covers Thermal and Moisture Protection?
Answer: Division 07
Division 07 covers Thermal and Moisture Protection, including roofing, waterproofing, insulation, air barriers, and vapor retarders.
A 'closed' specification is one that:
Answer: Limits acceptable products to a single named product with no substitutions
A closed specification names a single specific product with no substitutions or 'or equal' provisions, giving contractors no discretion in product selection.
What is the primary purpose of the 'Submittals' article in Part 1 of a specification section?
Answer: To list the documents the contractor must submit for review and approval
The Submittals article identifies the shop drawings, product data, samples, and other documents the contractor must submit for architect or engineer review and approval.
What does the acronym 'CSI' stand for in the context of construction specifications?
Answer: Construction Specifications Institute
CSI stands for Construction Specifications Institute, the professional organization that developed MasterFormat, SectionFormat, and other standard frameworks for construction documentation.
Which MasterFormat division covers Finishes such as drywall, flooring, and painting?
Answer: Division 09
Division 09 covers Finishes, including plaster, gypsum board assemblies, tiling, flooring, acoustic treatment, and painting and coating.
An 'or equal' clause in a specification allows:
Answer: Contractors to propose a substitute product if they can demonstrate equivalency
An 'or equal' clause permits a contractor to propose a substitution that they can demonstrate is equivalent to the specified product in quality, performance, and function.
Division 00 in MasterFormat covers which category of project information?
Answer: Procurement and Contracting Requirements
Division 00 covers Procurement and Contracting Requirements, including bidding documents, instructions to bidders, contract forms, and conditions of the contract.