  1. Which Agile ceremony is specifically designed to inspect the increment and adapt the product backlog based on stakeholder feedback?

    Answer: Sprint Review

    The Sprint Review is held at the end of each sprint to demonstrate the increment to stakeholders and gather feedback that may lead to backlog updates.

  2. In the Waterfall SDLC model, what is the primary characteristic that distinguishes it from iterative models?

    Answer: Sequential phases where each must complete before the next begins

    Waterfall follows a strict sequential progression where each phase (requirements, design, implementation, testing, deployment) must fully complete before the next begins.

  3. A team using Kanban wants to reduce work-in-progress bottlenecks. Which practice is most central to Kanban for achieving this?

    Answer: Setting WIP limits on workflow columns

    WIP (Work-In-Progress) limits are the defining Kanban practice that prevents overloading any stage of the workflow and exposes bottlenecks.

  4. During which SDLC phase is a feasibility study typically conducted?

    Answer: Planning

    A feasibility study is conducted during the Planning phase to evaluate technical, financial, and operational viability before committing resources.

  5. What does the Agile principle 'Working software over comprehensive documentation' mean in practice?

    Answer: Delivering functional software is prioritized, though documentation still has value

    Agile values working software more than comprehensive documentation but does not eliminate documentation — it simply deprioritizes excessive documentation over delivering value.

  6. Which role in Scrum is responsible for maximizing the value of the product and managing the product backlog?

    Answer: Product Owner

    The Product Owner owns and manages the product backlog, prioritizing items to maximize value delivered to stakeholders.

  7. In a V-Model SDLC, which testing phase corresponds to the Requirements Analysis phase?

    Answer: Acceptance Testing

    In the V-Model, Acceptance Testing on the right side corresponds to and validates the Requirements Analysis phase on the left side.