← All BGE Flashcard Decks

Tools & Equipment Operation Flashcards

7 cards from real BGE practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Tools & Equipment Operation flashcards as text
  1. When using a hydraulic crimping tool on a high-voltage cable lug, what is the correct sequence of steps?

    Answer: Select die, insert lug, crimp, inspect, release pressure

    Proper crimping sequence requires selecting the correct die for the conductor size, inserting the lug, applying crimping pressure until the tool cycles, inspecting the crimp, then releasing pressure.

  2. A gas utility technician needs to purge air from a newly installed 2-inch PE service line. Which tool is most appropriate for this task?

    Answer: Nitrogen purge kit with regulator

    A nitrogen purge kit with a regulator safely displaces air from new PE service lines before introducing natural gas, preventing explosive air-gas mixtures.

  3. Which excavation tool is preferred for exposing buried utilities within 18 inches of a marked gas line?

    Answer: Vacuum excavator (hydrovac)

    Vacuum excavation (hydrovac or air-vac) is the industry-standard safe digging method within the tolerance zone of marked utilities, eliminating strike risk.

  4. A Digital Multimeter (DMM) is set to measure AC voltage on a 480V circuit. Which terminal should the red probe be inserted into?

    Answer: VΩmA terminal

    The VΩmA terminal is used for voltage, resistance, and milliamp measurements; the COM terminal receives the black probe for all standard measurements.

  5. What is the primary purpose of a pipe locator (receiver) when used with a signal transmitter in gas distribution work?

    Answer: To trace the path and depth of buried metallic pipe

    A pipe locator receiver detects the electromagnetic signal induced in metallic pipe by a transmitter, allowing technicians to trace routing and estimate burial depth.

  6. When operating an electric chain saw for overhead vegetation management near distribution lines, the minimum safe approach distance for a qualified employee on a 15kV line is:

    Answer: 2 feet 2 inches

    OSHA 1910.269 and ANSI Z133 specify a minimum approach distance of 2 feet 2 inches for qualified employees working near energized conductors at distribution voltages up to 17.5kV.

  7. A technician uses a pipe threading machine to thread a 1-inch steel gas service riser. After threading, what is the immediate next step before applying pipe dope?

    Answer: Blow out chips with compressed air and inspect the thread

    Metal chips and cutting oil from the threading process must be cleared with compressed air and the thread visually inspected for completeness before any sealant is applied.