ADX Cheat Sheet 2026

The 30 highest-yield ADX facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.

80 questions
180 min time limit
70% to pass
  1. A dispatcher receives an AIRMET Sierra for the destination airport. Which condition does this specifically warn about? Mountain obscuration or IFR conditions
  2. If a dispatcher's continuous duty operations log shows more than 10 hours of duty without rest, what must occur? The dispatcher must be relieved and the duty log annotated to reflect the relief
  3. A dispatcher amends a flight release after departure. Which document must reflect the amended information? The original dispatch release with notations of changes
  4. During oceanic flight planning, an Aircraft Dispatcher must ensure the flight plan includes an ETOPS planning scenario. ETOPS stands for: Extended-range Twin-engine Operational Performance Standards
  5. What is the purpose of wing-mounted winglets on commercial jet aircraft? Reduce induced drag by limiting wingtip vortex strength
  6. Which of the following is a dispatcher's obligation under FAR 121.663 related to flight release documents? Ensure the dispatch release includes weather information sufficient for the flight
  7. What weather condition is indicated when a rawinsonde observation shows a sharp temperature inversion and very low dew point spread at a low altitude? A stable layer that suppresses convection and may trap pollutants
  8. Under 14 CFR Part 121, how long must an air carrier retain aircraft dispatch release records? 3 months
  9. A carrier switches from paper dispatch releases to a paperless electronic dispatch system. What FAA approval is required? An amendment to the carrier's Operations Specifications (OpSpecs) approved by the FAA
  10. What does the acronym NOTAM currently stand for following the 2021 FAA update? Notice to Air Missions
  11. What are the five phases of project management? Initiating, Planning, Executing, Monitoring and Controlling, Closing
  12. When may a Part 121 domestic operation be dispatched without listing an alternate airport? When the 1-2-3 rule is met for the destination
  13. What does the term 'MEL' stand for in aircraft operations? Minimum Equipment List
  14. Which federal law established the framework for regulating pollutant discharges into US waters? Clean Water Act
  15. Under 14 CFR 121.687, what information must be included in a domestic dispatch release? Identification of the flight, aircraft, airports, alternate airports, and pilot in command
  16. What must a dispatcher do if a pilot in command refuses to accept a dispatch release? Accept the refusal and advise the director of operations; the flight may not depart
  17. What is the purpose of a Job Safety Analysis (JSA)? To identify potential hazards in each step of a job and determine preventive measures
  18. When an aircraft dispatcher receives a PIREP indicating severe turbulence along a planned route, what is the FIRST action the dispatcher should take? Relay the PIREP to the flight crew immediately via ACARS or radio
  19. Why are tire inspections important for vehicle safety? Proper tire condition is critical for traction, handling, and preventing blowouts
  20. What does the 'autobrake' system on a large jet aircraft automatically adjust during the landing rollout? Brake hydraulic pressure to maintain a selected deceleration rate
  21. What is the correct procedure when a warning light activates during operation? Safely reduce speed, pull over when possible, and assess the situation
  22. What is the primary purpose of professional regulation in the ADX field? To protect the public by ensuring practitioners meet minimum competency standards
  23. What is the purpose of a dispatcher conducting regular safety audits? To ensure the company meets regulatory guidelines and safety standards
  24. What position should an unconscious but breathing person be placed in? Recovery position (on their side)
  25. Which of the following best describes the 'Safety Policy' component of an airline's SMS? Management's commitment to safety and defined accountability for safety performance
  26. Which document must a dispatcher retain and make available for inspection after a flight is completed under Part 121? The dispatch release, flight plan, and weather reports used
  27. Why is stakeholder management important in projects? Because stakeholder support and engagement are critical to project success
  28. What must a dispatcher do if they discover a significant error in a flight release after the aircraft has already departed? Immediately notify the PIC via radio or ACARS and document the correction
  29. Which type of NOTAM contains regulatory information such as amendments to published instrument approach procedures? FDC NOTAM
  30. What does 'VMO/MMO' refer to in aircraft operations? Maximum operating speed in knots / maximum operating Mach number
Turn these facts into recall: