โ† All ACE Flashcard Decks

Collaboration & Team Workflows Flashcards

7 cards from real ACE practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 7 Collaboration & Team Workflows flashcards as text
  1. In an Autodesk BIM 360/ACC project, what is the role of the 'Project Admin' versus a 'Member' role?

    Answer: Project Admins manage user access and permissions across services; Members have roles scoped to specific modules

    Project Admins in ACC configure services, invite members, and set permission levels, while Members operate within the permissions assigned to them per module.

  2. What is the best practice for managing Revit linked files in a collaborative multi-discipline BIM project?

    Answer: Keep discipline models as separate linked files with defined coordinate systems and shared project north

    Separate RVT files per discipline linked together with a shared coordinate system is the standard federated BIM workflow, preserving discipline ownership and data integrity.

  3. In Autodesk Construction Cloud, what does setting a folder's permission to 'View only' accomplish for a team member?

    Answer: The member can open and read files but cannot upload, edit, or move them

    'View only' permission in ACC restricts the member to reading file content without any ability to modify, upload, or reorganize the folder's contents.

  4. When coordinating MEP and structural models in Navisworks, what does a 'hard clash' mean?

    Answer: Two elements physically occupy the same space (geometric intersection)

    A hard clash in Navisworks occurs when two elements geometrically intersect, meaning they physically occupy the same space in the model.

  5. In Autodesk Vault, what is the purpose of 'Item Masters' in a product design workflow?

    Answer: They represent the engineering item (part number) that persists independently of the CAD file lifecycle

    Item Masters in Vault decouple the engineering BOM item from the CAD file, allowing the item identity and revision history to persist across file replacements or redesigns.

  6. Which Autodesk tool is specifically designed to help project teams perform 4D scheduling reviews by animating construction sequence?

    Answer: Navisworks TimeLiner

    Navisworks TimeLiner animates the construction sequence by linking schedule data to model objects, making it the standard tool for 4D schedule review.

  7. In Revit, what is the recommended method to communicate design changes to a linked discipline's team in a BIM collaboration workflow?

    Answer: Use Coordination Review to flag unresolved changes in linked models and communicate via the BIM coordination meeting

    Coordination Review in Revit surfaces changes in linked models, and BIM coordination meetings are the standard forum for resolving cross-discipline issues flagged there.