When conducting a sanitary survey, which item represents a significant deficiency requiring immediate corrective action?
Answer: An uncovered finished water reservoir
An uncovered finished water reservoir is a direct pathway for contamination and a critical regulatory deficiency.
What is the correct procedure when a field pH meter reading drifts more than 0.2 units during a calibration check?
Answer: Recalibrate the meter using fresh buffer solutions
Drift >0.2 pH units indicates calibration error; the meter must be recalibrated before any samples are measured.
A sewer main inspection reveals root intrusion at multiple joints. The BEST long-term corrective measure is:
Answer: Cured-in-place pipe (CIPP) lining or joint replacement
Structural rehabilitation via CIPP or joint replacement eliminates the entry points that allow recurring root growth.
During a pump station inspection, the inspector records a 10-minute pump runtime per cycle and a 5-minute off time. What is the pump duty cycle?
Answer: 67%
Duty cycle = run time / (run time + off time) = 10 / 15 = 67%; excessive duty cycles indicate potential undersizing or inflow/infiltration.
What does a negative pressure reading on the suction side of a centrifugal pump indicate?
Answer: The pump is drawing water from a source below the impeller (suction lift)
Negative (below atmospheric) pressure on the suction side is normal when the pump is lifting water from a lower source.
Under 40 CFR Part 141, what is the minimum free chlorine residual required in a public water system distribution system?
Answer: 0.1 mg/L detectable
The Total Coliform Rule requires a detectable (measurable) disinfectant residual throughout the distribution system; EPA guidance cites 0.2 mg/L but 0.1 mg/L is the detectable threshold.
What is the purpose of a jar test performed during a water treatment plant inspection?
Answer: Simulating coagulation and flocculation to optimize chemical dosing