STSC Cheat Sheet 2026

The 30 highest-yield STSC facts, distilled from real exam questions. Print it, save it as a PDF, or study it here β€” free, no sign-up.

100 questions
120 min time limit
70.00% to pass
  1. Which engineering control is most effective at reducing worker exposure to wood dust during cutting operations? β†’ Local exhaust ventilation (LEV) at the source
  2. When storing pneumatic nailers at the end of a shift, what is the required first step? β†’ Disconnect the air supply hose
  3. When conducting a Job Hazard Analysis (JHA) for a new construction task, what is the correct first step? β†’ Break the job down into its basic steps
  4. A supervisor's span of control on a construction site refers to: β†’ The number of workers one supervisor can effectively oversee
  5. Where must excavated material (spoil) be placed relative to the edge of a trench according to OSHA 1926.651(j)(2)? β†’ At least 2 feet from the edge of the excavation
  6. Before a contractor begins work in a permit-required confined space owned or controlled by the host employer, the host employer must: β†’ Inform the contractor of permit space hazards, precautions, and emergency procedures
  7. A construction safety program's written emergency action plan must include which of the following? β†’ Procedures for reporting fires and other emergencies
  8. What medical condition can result from repeated hand-arm vibration exposure from tools like jackhammers over several years? β†’ Hand-arm vibration syndrome (HAVS), including vibration white finger
  9. What does the lockout/tagout (LOTO) procedure require before servicing or maintaining a power tool? β†’ De-energizing and locking out the energy source before any service begins
  10. A tag line is used during crane lifts primarily to: β†’ Control load rotation and prevent swinging without workers pulling the load directly
  11. A construction site is near a former dry-cleaning facility. Workers should be most concerned about exposure to which contaminant in soil and groundwater? β†’ Tetrachloroethylene (PCE/PERC)
  12. An STSC supervisor observes workers using a metal ladder near overhead power lines. What is the correct guidance according to OSHA electrical safety standards? β†’ Non-conductive (fiberglass or wood) ladders must be used near electrical hazards
  13. What is the primary hazard created by using a pneumatic nail gun with the contact-trip safety feature defeated or bypassed? β†’ Unintentional nail discharge and double-fire events that cause penetrating injuries
  14. A supervisor who consistently models safe behavior on the job site is demonstrating which leadership principle? β†’ Leading by example
  15. What is the minimum air monitoring requirement before entering a permit-required confined space? β†’ Test for oxygen, flammable gases, and toxic air contaminants
  16. Which hierarchy of controls option is considered most effective when addressing a recognized construction site hazard? β†’ Elimination of the hazard
  17. Which section of the SDS provides first-aid instructions if a worker splashes a chemical in their eyes? β†’ Section 4 – First-Aid Measures
  18. Which section of the Safety Data Sheet (SDS) contains information about required personal protective equipment? β†’ Section 8 - Exposure Controls/Personal Protection
  19. A supervisor who leads by example in wearing all required PPE is demonstrating which principle of effective safety leadership? β†’ Visible felt leadership
  20. In the event of a fall from height, which of the following actions should be taken immediately? β†’ Secure the area and assess the worker’s condition before calling for medical help
  21. A safety supervisor notices a worker's safety harness webbing has a cut through roughly 40% of its width. The correct action is to: β†’ Remove the harness from service immediately and destroy or quarantine it
  22. What must be done before lifting with any crane at the start of each shift? β†’ Complete a pre-shift inspection by a competent person
  23. Which safeguard is specifically required when using a table saw on a construction site? β†’ Anti-kickback device and blade guard
  24. What is the purpose of the '5 Whys' technique in incident investigation? β†’ To repeatedly ask 'why' in order to move from immediate causes to underlying root causes
  25. What is the correct order of priorities in the Incident Command System (ICS) during a construction emergency? β†’ Life safety, incident stabilization, property preservation
  26. Which of the following is an example of a physical hazard commonly found on construction sites? β†’ Falling objects
  27. Under OSHA 29 CFR 1926, which subpart specifically governs hand and power tools used in construction? β†’ Subpart I
  28. Which communication style is most effective when issuing urgent safety instructions on a noisy construction site? β†’ Clear, short verbal commands combined with hand signals or visual cues
  29. When using chemicals with known skin absorption hazards on a construction site, the primary PPE control is: β†’ Chemical-resistant gloves appropriate for the specific chemical
  30. What is the primary purpose of a Job Hazard Analysis (JHA) in emergency preparedness? β†’ To identify potential hazards and plan controls before work begins