STSC Cheat Sheet 2026
The 30 highest-yield STSC facts, distilled from real exam questions. Print it, save it as a PDF, or study it here β free, no sign-up.
100 questions
120 min time limit
70.00% to pass
- Which engineering control is most effective at reducing worker exposure to wood dust during cutting operations? β Local exhaust ventilation (LEV) at the source
- When storing pneumatic nailers at the end of a shift, what is the required first step? β Disconnect the air supply hose
- When conducting a Job Hazard Analysis (JHA) for a new construction task, what is the correct first step? β Break the job down into its basic steps
- A supervisor's span of control on a construction site refers to: β The number of workers one supervisor can effectively oversee
- Where must excavated material (spoil) be placed relative to the edge of a trench according to OSHA 1926.651(j)(2)? β At least 2 feet from the edge of the excavation
- Before a contractor begins work in a permit-required confined space owned or controlled by the host employer, the host employer must: β Inform the contractor of permit space hazards, precautions, and emergency procedures
- A construction safety program's written emergency action plan must include which of the following? β Procedures for reporting fires and other emergencies
- What medical condition can result from repeated hand-arm vibration exposure from tools like jackhammers over several years? β Hand-arm vibration syndrome (HAVS), including vibration white finger
- What does the lockout/tagout (LOTO) procedure require before servicing or maintaining a power tool? β De-energizing and locking out the energy source before any service begins
- A tag line is used during crane lifts primarily to: β Control load rotation and prevent swinging without workers pulling the load directly
- A construction site is near a former dry-cleaning facility. Workers should be most concerned about exposure to which contaminant in soil and groundwater? β Tetrachloroethylene (PCE/PERC)
- An STSC supervisor observes workers using a metal ladder near overhead power lines. What is the correct guidance according to OSHA electrical safety standards? β Non-conductive (fiberglass or wood) ladders must be used near electrical hazards
- What is the primary hazard created by using a pneumatic nail gun with the contact-trip safety feature defeated or bypassed? β Unintentional nail discharge and double-fire events that cause penetrating injuries
- A supervisor who consistently models safe behavior on the job site is demonstrating which leadership principle? β Leading by example
- What is the minimum air monitoring requirement before entering a permit-required confined space? β Test for oxygen, flammable gases, and toxic air contaminants
- Which hierarchy of controls option is considered most effective when addressing a recognized construction site hazard? β Elimination of the hazard
- Which section of the SDS provides first-aid instructions if a worker splashes a chemical in their eyes? β Section 4 β First-Aid Measures
- Which section of the Safety Data Sheet (SDS) contains information about required personal protective equipment? β Section 8 - Exposure Controls/Personal Protection
- A supervisor who leads by example in wearing all required PPE is demonstrating which principle of effective safety leadership? β Visible felt leadership
- In the event of a fall from height, which of the following actions should be taken immediately? β Secure the area and assess the workerβs condition before calling for medical help
- A safety supervisor notices a worker's safety harness webbing has a cut through roughly 40% of its width. The correct action is to: β Remove the harness from service immediately and destroy or quarantine it
- What must be done before lifting with any crane at the start of each shift? β Complete a pre-shift inspection by a competent person
- Which safeguard is specifically required when using a table saw on a construction site? β Anti-kickback device and blade guard
- What is the purpose of the '5 Whys' technique in incident investigation? β To repeatedly ask 'why' in order to move from immediate causes to underlying root causes
- What is the correct order of priorities in the Incident Command System (ICS) during a construction emergency? β Life safety, incident stabilization, property preservation
- Which of the following is an example of a physical hazard commonly found on construction sites? β Falling objects
- Under OSHA 29 CFR 1926, which subpart specifically governs hand and power tools used in construction? β Subpart I
- Which communication style is most effective when issuing urgent safety instructions on a noisy construction site? β Clear, short verbal commands combined with hand signals or visual cues
- When using chemicals with known skin absorption hazards on a construction site, the primary PPE control is: β Chemical-resistant gloves appropriate for the specific chemical
- What is the primary purpose of a Job Hazard Analysis (JHA) in emergency preparedness? β To identify potential hazards and plan controls before work begins