Question 1: What is the primary purpose of a data collection plan in the Measure phase?
- To ensure consistent, accurate, and relevant data is gathered systematically (Correct answer)
- To assign team roles for the project
- To create a project charter
- To identify root causes of defects
Correct answer: To ensure consistent, accurate, and relevant data is gathered systematically
A data collection plan defines what data to collect, how, when, and by whom to ensure consistency and accuracy.
Question 2: Which metric represents the number of defects per million opportunities?
- Cp
- DPMO (Correct answer)
- Cpk
- RTY
Correct answer: DPMO
DPMO (Defects Per Million Opportunities) normalizes defect counts to allow comparison across processes with different complexities.
Question 3: What does a Measurement System Analysis (MSA) primarily evaluate?
- The capability of the process to meet specifications
- The reliability and accuracy of the measurement system itself (Correct answer)
- The financial cost of collecting data
- The number of defects in a sample
Correct answer: The reliability and accuracy of the measurement system itself
MSA assesses whether the measurement system produces reliable, repeatable, and reproducible results.
Question 4: In the Measure phase, what is the difference between accuracy and precision?
- Accuracy is closeness to the true value; precision is consistency of repeated measurements (Correct answer)
- Accuracy refers to sample size; precision refers to defect count
- They are interchangeable terms in Six Sigma
- Accuracy applies to continuous data only; precision applies to discrete data only
Correct answer: Accuracy is closeness to the true value; precision is consistency of repeated measurements
Accuracy means measurements are close to the actual value, while precision means repeated measurements are close to each other.
Question 5: What type of data would 'pass/fail inspection results' be classified as?
- Continuous data
- Attribute data (Correct answer)
- Variable data
- Ratio data
Correct answer: Attribute data
Pass/fail results are attribute (discrete) data because they fall into distinct categories rather than measured values on a scale.
Question 6: Which tool is used during the Measure phase to visually display process performance over time?
- Fishbone diagram
- Control chart (Correct answer)
- SIPOC diagram
- Affinity diagram
Correct answer: Control chart
Control charts plot data points over time against control limits to reveal process stability and variation patterns.