Question 1: A cable tray holds 48 cables. If 3/8 of the tray is already filled, how many more cables can be added?
- 18
- 24
- 30 (Correct answer)
- 36
Correct answer: 30
3/8 of 48 = 18 cables filled. 48 - 18 = 30 remaining spaces.
First calculate how many cables are already in the tray: 3/8 ร 48 = (3 ร 48) รท 8 = 144 รท 8 = 18 cables. Then subtract from total: 48 - 18 = 30 more cables can be added.
Question 2: An electrician earns $34.50 per hour and works 8.5 hours. What is the total pay before deductions?
- $287.00
- $293.25 (Correct answer)
- $279.50
- $310.50
Correct answer: $293.25
Total = $34.50 ร 8.5 = $293.25.
Total pay = hourly rate ร hours worked = $34.50 ร 8.5. Calculate: 34.50 ร 8 = $276.00, and 34.50 ร 0.5 = $17.25. Adding: $276.00 + $17.25 = $293.25.
Question 3: If a conduit run is 120 feet long and must be supported every 8 feet, how many supports are needed?
- 14
- 15 (Correct answer)
- 16
- 13
Correct answer: 15
120 รท 8 = 15 supports (one at each 8-foot interval, plus the starting point = 16, but typically the count is the number of intervals = 15).
Dividing 120 feet by 8 feet per interval = 15 intervals. For supports at each interval: you need supports at 8, 16, 24...120 feet = 15 supports. (The endpoint at 0 ft is the anchor, and the last support is at 120 ft, giving 15 total.)
Question 4: A wire spool contains 500 feet of wire. After using 137.5 feet, what percentage of wire remains?
- 27.5%
- 72.5% (Correct answer)
- 62.5%
- 37.5%
Correct answer: 72.5%
Wire remaining: 500 - 137.5 = 362.5 feet. Percentage remaining = (362.5/500) ร 100 = 72.5%.
Wire used: 137.5 feet. Wire remaining: 500 - 137.5 = 362.5 feet. Percentage remaining: (362.5 รท 500) ร 100 = 72.5%. Alternatively: percentage used = (137.5 รท 500) ร 100 = 27.5%, so 100% - 27.5% = 72.5% remains.
Question 5: Three electricians can wire a building in 12 days. How many days would it take 4 electricians working at the same rate?
- 8
- 9 (Correct answer)
- 10
- 16
Correct answer: 9
Total work = 3 ร 12 = 36 person-days. With 4 workers: 36 รท 4 = 9 days.
Total work = number of workers ร days = 3 ร 12 = 36 person-days. With 4 electricians: 36 รท 4 = 9 days. This is an inverse proportion problem โ more workers means fewer days needed.
Question 6: What is 15% of 240 added to 25% of 160?
- 72
- 76
- 80 (Correct answer)
- 68
Correct answer: 80
15% of 240 = 0.15 ร 240 = 36. 25% of 160 = 0.25 ร 160 = 40. Total = 36 + 40 = 76.
15% of 240: 0.15 ร 240 = 36. 25% of 160: 0.25 ร 160 = 40. Sum: 36 + 40 = 76. The answer is 76.