Free Lean Six Sigma Yellow Belt Certification Trivia Questions and Answers — Questions and Answers
Question 1: When a process has demonstrated its ability to perform at a Six Sigma level, it implies there are less than ___ failures per million chances.
- 3.4 (Correct answer)
- 1.7
- 10
- 2.6
Correct answer: 3.4
Six Sigma was first used in manufacturing as a quality control tool. When long-term defect levels are below 3.4 defects per million opportunities (DPMO), Six Sigma quality is attained.
Question 2: A Lean Six Sigma approach called "Voice of the Customer" is used to identify a product or service's ______ qualities.
- Preferred
- Critical-to-Quality (Correct answer)
- Beneficial
- Desirable
Correct answer: Critical-to-Quality
The term "Critical to Quality" (CTQ) is used in Six Sigma to identify the features of a good, service, or procedure that matter most to the client. It is often referred to as the Voice of the Customer (VOC). Aspects of a business that are essential to ensuring the satisfaction of customers are referred to as critical-to-quality.
Question 3: Suppliers, Inputs, _____, Output and Customers are all referred to as SIPOC.
- Process (Correct answer)
- Presentation
- Production
- Products
Correct answer: Process
Suppliers, Inputs, Processes, Outputs, and Customers are together known as SIPOC. Practically speaking, SIPOC is a strategy for summarizing the inputs and outputs of one or more processes in order to describe and improve operations.
Question 4: The ______ is a tool that we use to find potential flaws (failures) in our procedure and the effects they could have.
- Juran Journey
- FMEA (Correct answer)
- SIPOC
- Shewhart Analysis
Correct answer: FMEA
Failure Mode Effects Analysis (FMEA) is a method for predicting what could go wrong with a product or process. It may also be used to determine potential failure reasons and probability.
Question 5: The Pareto Chart is a method for displaying data that generally follows what ratio?
- 70:30
- 95:5
- 80:20 (Correct answer)
- 90:10
Correct answer: 80:20
The Pareto Principle, sometimes known as the 80-20 rule, is a popular 'rule of thumb' that claims that 80% of the effects of anything can be traced to 20% of the drivers. <br> <br> Many firms realize that 80% of their revenues are generated by 20% of their items. As a result, it makes sense for them to focus on the 20% of those clients who have the most potential for profit.
Question 6: A 5 Why Analysis is done to help identify potential failure causes when which of the following tools is created?
- Pareto Chart
- Fishbone Diagram (Correct answer)
- SIPOC
- X-Y Matrix
Correct answer: Fishbone Diagram
The 5 Whys can be used alone or as part of the fishbone diagram (also known as the cause and effect diagram or Ishikawa). The fishbone diagram allows you to explore all potential or true reasons of a single defect or failure. Once all inputs have been established on the fishbone, the 5 Whys approach may be used to drill down to the fundamental reasons.
Question 7: Measurement System Analysis is a process used to assess variation in the method or system used for taking measurements and to ensure useable data is gathered.
- False
- True (Correct answer)
Correct answer: True
The Measurement System Analysis (MSA) tool is used to analyze the variation in various types of inspection, measurement, and test equipment. It is the system used to evaluate the measuring system's quality. In other words, it enables us to verify that the variation in our measurement is limited when compared to the variation in our process.
Question 8: Reducing the__ is one of the main objectives in creating and defining an LSS project.
- Work force
- Cost of Poor Quality (Correct answer)
- Inventory
- Number of process steps
Correct answer: Cost of Poor Quality
One of the primary goals of Lean Six Sigma (LSS) projects is to reduce the Cost of Poor Quality (COPQ). COPQ refers to the total costs incurred as a result of poor quality in products or services. These costs can include both tangible costs, such as rework, scrap, warranty claims, and customer returns, as well as intangible costs like customer dissatisfaction and lost business opportunities.
Question 9: The lean improvement methodology improves value-adding activities while decreasing non-value-adding ones.
- False
- True (Correct answer)
Correct answer: True
The Lean improvement approach is centered around the concept of reducing non-value-adding activities (often referred to as waste) and increasing value-adding activities. This approach is a fundamental principle of Lean thinking and aims to streamline processes, eliminate inefficiencies, and enhance the overall value delivered to customers.
Question 10: With fewer decisions required, a process is more efficient.
- False
- True (Correct answer)
Correct answer: True
A process tends to be more efficient when there are fewer decision requirements within that process. <br> Decision-making points in a process can introduce delays, cause interruptions, and lead to uncertainty. When there are numerous decision points, it can slow down the flow of work and increase the potential for errors or rework. In contrast, a streamlined process with minimal decision requirements can lead to smoother and faster execution.
Question 11: Increased value-adding activities should be implemented to increase process efficiency.
- False
- True (Correct answer)
Correct answer: True
To improve process efficiency, the focus should be on increasing value-adding activities while minimizing or eliminating non-value-adding activities (waste). Value-adding activities are those that directly contribute to meeting customer needs and requirements, while non-value-adding activities are activities that do not contribute to the final product or service from the customer's perspective.
Question 12: Increased standard deviation should be used to enhance process capabilities.
- False (Correct answer)
- True
Correct answer: False
The statement is false. <br> To improve process capability, the standard deviation should be reduced, not increased. Process capability refers to the ability of a process to consistently produce products or deliver services that meet customer specifications within certain limits.
Question 13: It's a component of the project charter that needs to be "SMART."
- Business Case
- Project Scope
- Goal Statement (Correct answer)
- None of the above
Correct answer: Goal Statement
The "Goal Statement" in a Project Charter should be "SMART." The SMART criteria are a framework used to ensure that goals and objectives are well-defined and achievable.
Question 14: If 7, 8, 8, 9, and 10 are given, the mode is
- 5
- 8.4
- 8 (Correct answer)
- 9
Correct answer: 8
The mode of a set of numbers is the value that appears most frequently in the set. In the sequence you provided (7, 8, 8, 9, 10), the number "8" appears more frequently than any other number, making it the mode of the sequence.
Question 15: The following are project charter components, but not:
- Billing Statement (Correct answer)
- Goal Statement
- Business Case
- Problem Statement
Correct answer: Billing Statement
A project charter is a document that outlines the scope, objectives, and essential details of a project. While "Billing Statement" is not typically a component of a project charter.
Question 16: Given the Net Promoter Scores (NPS) of the aforementioned information: 51, 56, 42, 62, 57, 61, 71, 54, 60, 59. The Cpk is 60 NPS with a goal of
- 6.8
- -6.8
- 0.12
- -0.12 (Correct answer)
Correct answer: -0.12
A Cpk of -0.12 suggests that the process is not meeting the specifications, and the distribution of values is skewed outside of the acceptable limits. A Cpk value below 1 generally indicates that the process is not capable of consistently producing within the desired range.
When a process has demonstrated its ability to perform at a Six Sigma level, it implies there are less than ___ failures per million chances.